West Lake Hills sits on the edge of the Texas Hill Country, about six miles west of downtown Austin, and it runs its own building and permitting process. Concrete Commandos Bee Cave pours driveways, patios, pool decks and walkways for West Lake Hills homes with that process, and the lot's slope and drainage, in mind.
About West Lake Hills
West Lake Hills was incorporated on September 9, 1953, and stretches roughly four square miles along Bee Cave Road and Redbud Trail in Travis County. The city describes its goal as preserving the pastoral Hill Country environment, and it is recognized as a Scenic City by Scenic Texas. Day to day life centers on places such as the Village at Westlake shopping center, the Westlake Athletic and Community Center and the Westbank Community Library. Public school students are served by Eanes ISD, including Westlake High School, although school district boundaries are separate from city limits.
Concrete on West Lake Hills lots
Many lots in West Lake Hills are larger than typical suburban lots and sit on sloped, wooded ground. That makes concrete work as much a drainage and grading project as a finish project. A driveway has to climb or descend a slope, a patio often needs a retaining edge or a step down, and a pool deck has to shed water without sending it onto a neighboring lot.
- Driveways: grade, apron and drainage planned together. See concrete driveways.
- Patios and outdoor living: slabs that fit the slope and the trees you want to keep. See concrete patios and stamped concrete.
- Pool decks: separate pool permit, proper drainage and slip-resistant finishes. See pool decks.
- Replacement and repair: older slabs that have settled or cracked. See concrete repair.
Impervious cover and why it matters for concrete
Concrete is impervious cover. According to the city's FAQ, impervious cover rules in West Lake Hills differ by zoning district, and single-family properties of 0.5 acre or larger have a maximum of 25 percent impervious cover, with a bonus for smaller properties on central wastewater as described in the code. That limit applies to everything that sheds water, including the house, driveway, patio and walkways, so every extra slab uses part of the lot's allowance. The size and shape of a patio or driveway should be decided with that total in mind, and your permit plans should show it.
Permit notes
West Lake Hills issues its own permits. The city accepts residential building permit applications online through MGOConnect, and its application form covers new construction, remodels and additions, pools, landscaping and changes to impervious cover. A few points from the city's published guidance:
- All applications go through MGOConnect, and the city does not accept hard copies or emailed applications for review.
- The city says it aims to provide a complete set of comments within about three to four weeks of an application, and larger projects can take longer.
- Drainage plans are submitted with the building permit application and reviewed by the city engineer's office.
- Swimming pools need a separate permit, and new fences need permits.
- Fire review is provided by Travis County Emergency Services District 9, and water service comes from Travis County Water District 10.
- To confirm that an address is inside the city limits, the city points to the City of Austin Jurisdictions Map, which should show West Lake Hills Full Purpose.
Rules change, so confirm requirements with the West Lake Hills Building and Development Services department before you finalize a design. We build to the approved plans and coordinate with your designer, builder or pool contractor.
Getting started
Tell us about the project and the lot. We can talk through size, slope, finish and how the concrete fits the permit plans. For a general overview of what we do across Bee Cave and the Lake Travis area, visit our Bee Cave concrete contractor page.
Hillside ground and drainage
West Lake Hills sits in the Texas Hill Country, where lots can rise and fall quickly and the ground can switch from shallow limestone to clay pockets that swell when wet and shrink when dry. For concrete, that means the base under a slab can be uneven and water needs a clear path off the surface. Projects that often come up on hillside lots include driveway grading, patios with planned drainage, and pool decks near steep edges.
City permit steps and official links
The City of West Lake Hills asks that permit applications be submitted through the My Government Online portal (MGOConnect). Its Building and Development page lists the permit forms, including a residential application that covers pools, landscaping and changes or additions to impervious cover, so new flatwork may be covered. The city says that once an application is complete, the first round of comments can take up to four weeks, so it is wise to plan for permits before a pour date.
Related concrete work
Older slabs are sometimes candidates for repair before replacement, and walkways may need steps where the grade changes. Nearby Barton Creek and Lakeway have their own rules and slopes; see Barton Creek and Lakeway for those areas.
Planning ahead on a hillside lot
Permit review and neighborhood rules can take weeks, so settle the design, drainage plan and finish before you pick a start date. Bring a rough sketch, photos of the slope, any survey you have and notes on where water runs during a heavy rain. That shows whether a slab needs extra grading, a different base or a different spot on the lot. The free estimate page lists what to have ready.
Map of West Lake Hills, TX
Concrete services in West Lake Hills
Frequently asked questions
Does West Lake Hills require a permit for a new driveway or patio?
The city issues its own permits and treats changes to impervious cover as part of its permit process. Whether a specific driveway or patio needs a permit depends on the project, so contact the city's Building and Development Services department before you start.
What is the impervious cover limit in West Lake Hills?
The city's FAQ states that single-family properties of 0.5 acre or larger have a maximum of 25 percent impervious cover, with different rules for smaller lots and other zoning districts. Check the current code for your lot.
How long do West Lake Hills permits take?
The city says it aims to provide comments within about three to four weeks of application, but larger projects and variances take longer. Build permit time into your schedule.
How do I know if my address is inside West Lake Hills?
The city recommends using the City of Austin Jurisdictions Map and looking for West Lake Hills Full Purpose. Many addresses share the 78746 ZIP code with Austin and nearby cities, so the ZIP code alone is not enough.
Do you pour pool decks in West Lake Hills?
Yes. Pools need their own permit in West Lake Hills, and we pour the deck to the approved plans. See our pool decks page for finish and drainage details.
Does a new patio or driveway count as added impervious cover in West Lake Hills?
It can. The city's residential permit application covers changes or additions to impervious cover, and the city has its own impervious cover rules in its Code of Ordinances. Check with Building and Development Services before you add flatwork on your lot.